Its not an A-team post. "I pity the fool who..."
There were a few snags getting this thing lined up, but I think that I've finally got it sorted out.
The truss guy bailed on me, and so I had to scramble to find someone to build trusses on short notice. Done. He was more expensive, but they'll be there.
The building materials are ordered, and except for the windows will be delivered the 31stof August.
Friends and family have put their long weekends on hold.
Its going to go like this.
Friday August 31
Head to Eureka early to finalize power installation and make sure the building materials got delivered.
Rent an air nailer
Buy beer, pop, water, snack foods
Site survey to verify concrete is as expected
Check into Hotel in Eureka
Greet incoming help. Eat, drink, be merry.
Sleep.
Saturday September 1
Breakfast
Muster at build site
Figure out build teams
Setup equipment
Start framing
Lunch at site
Sunday September 2
Muster at build site
Roofing ( I hope)
Monday September 3
Not needed (I hope)